Comprehensive Cleaning Procedure for an Extrusion Expander

Table of Contents

Proper cleaning is a critical safety and operational procedure that ensures product quality consistency, prevents microbial growth, eliminates allergen cross-contamination,extruding machines and maintains machine efficiency. Follow this detailed, step-by-step guide for a thorough cleaning process.


Phase 1: Pre-Cleaning Safety & Preparation

1.1 Safety First – Lock Out, Tag Out (LOTO)

  • Complete Shutdown: Follow the full shutdown procedure, extruding machines allowing the machine to cool. Product temperatures must be below 50°C (122°F) before disassembly begins.
  • Energy Isolation: Perform LOTO on all energy sources: Main motor power, heater circuits, feeder drives, and any auxiliary systems. Verify isolation.
  • Personal Protective Equipment (PPE): Wear heat-resistant gloves, safety goggles, long sleeves, dust masks (for dry cleaning), and steel-toed boots.

1.2 Material & Tool Preparation

  • Have ready: Food-grade cleaning brushes (nylon, brass), plastic scrapers, vacuum cleaner rated for fine powder, containers for parts, and appropriate cleaning agents (food-grade alkaline or neutral detergents).
  • Clear the surrounding area and lay out a clean, soft surface (like a rubber mat) for disassembled parts.

Phase 2: Systemic Purge & Dry Cleanout

2.1 Pre-Disassembly Purge

  • After production, run a purge material (e.g., wheat bran, rice hulls, or a proprietary purge compound) through the system. extruding machines This pushes out most residual product and absorbs oils.
  • Continue purging until only the purge material exits the die.

2.2 Feeder & Pre-Conditioner Cleanout

  • Empty and vacuum all material from the main feeder hopper, feeder screw, and pre-conditioner.
  • Remove access panels and manually brush out all residual powder and dough.

Phase 3: Disassembly Sequence

Always follow the manufacturer’s specific teardown sequence.

  1. Die Assembly Removal:
    • Loosen the end clamp bolts gradually in a cross pattern to release pressure evenly.
    • Carefully remove the die head assembly (housing, die plate, cutter assembly). It may still be warm and contain hot, pressurized material—handle with extreme care.
  2. Screw Removal:
    • Using the correct tooling (screw puller/winch), carefully extract the twin screws from the barrel.
    • Critical: Place the screws on a dedicated rack or a clean, protected surface. Do not allow the flight tips to impact hard surfaces.

Phase 4: Manual Cleaning of Components

4.1 Screws

  • Use brass scrapers or plastic scrapers to remove all burnt-on or caked-on product. extruding machines NEVER use steel tools as they will scratch and damage the hardened screw surfaces.
  • Clean between the screw flights and the root meticulously.
  • For stubborn deposits, a controlled application of hot water or a mild detergent solution with a brush is permissible. Dry immediately and completely.

4.2 Die Assembly & Die Plate

  • Remove the die plate from the die head. Soak both in warm water to soften product residues.
  • Use non-metallic brushes to clean all holes and surfaces. Ensure every die hole is completely clear by visually inspecting for light passage.
  • Clean the cutter blades and housing.

4.3 Barrel

  • With screws removed, inspect all barrel sections.
  • Use long-handled nylon brushes and a vacuum to clean the barrel bores. A lint-free cloth dampened with food-grade alcohol can be used for a final wipe to remove fine dust and oils.
  • Important: Never leave the barrel wet. Moisture causes corrosion and, during next startup, can lead to steam explosions.

4.4 Feed Zone & Other Components

  • Clean the feed hopper, feed screw, and all chutes.
  • Wipe down the exterior of the machine to remove dust and grease.

Phase 5: Inspection & Reassembly

5.1 Critical Inspection

  • Wear Check: Inspect screws and barrel liners for excessive wear. Measure the clearance between screw flight tips and barrel wall. Replace components if wear exceeds manufacturer specifications.
  • Damage Check: Look for cracks, pitting, or severe scratches on screws, dies, and barrel sections.
  • Seal Check: Inspect all gaskets, seals, and wear rings. Replace any that are damaged or worn.

5.2 Reassembly

  • Apply a thin, food-grade anti-seize lubricant to screw splines and barrel mating surfaces only where specified in the manual.
  • Carefully reinsert the screws into the barrel, extruding machines ensuring they are correctly aligned and fully seated.
  • Reinstall the die assembly, tightening bolts in a star/cross pattern to the manufacturer’s specified torque to ensure an even, leak-free seal.
  • Remove all LOTO devices and tools from the work area.

Phase 6: Sanitization & Post-Cleaning Protocol

  • For food/feed applications, after mechanical cleaning, a sanitization step may be required. This can involve flushing the system with steam or a food-grade sanitizer solution, followed by a thorough drying purge (e.g., with dry corn meal).
  • Documentation: Record the cleaning in the equipment log, noting the date, time, products run before cleaning, any parts replaced, and the personnel involved.
  • Preparation for Next Run: Ensure the machine is dry, reassembled correctly, and ready for the pre-startup checks of the next production run.

Core Principle: An extrusion expander is only as good as its last cleaning. A disciplined, thorough, and documented cleaning procedure is not just maintenance—it is the foundation of product safety, quality, and operational reliability.